Vendor fraud has become a significant issue in the business marketplace, and we’ve noticed an alarming increase in its prevalence. Please be informed that Rieker has never issued a Purchase Order (PO) using private email addresses such as Gmail, Yahoo, or iCloud. This is a crucial measure to ensure the utmost security for our prospective vendors. Please note that it’s rare for Rieker to open POs with unauthorized vendors requesting net 30 terms. Therefore, if you suspect that you may have received a suspicious PO, please don’t hesitate to contact our main number at (610)-500-2000 to verify the authenticity of the PO.

For a first time PO, please contact us directly via purchasing@riekerinc.com for confirmation as an added precaution.

3D infrastructure model with obstruction
3D infrastructure model with obstruction

ADAM – Advanced Data Acquisition & Measurement Solution

ADA Sidewalk and Curb Ramp Assessment and Compliance Solution

ADAM – Advanced Data Acquisition & Measurement is a mobile, portal-based solution for comprehensive ADA sidewalk and curb ramp assessment, compliance, and engineering. Powered by Rieker’s proven inclinometer technology and enhanced with advanced computer vision techniques and web-based measurement tools, ADAM streamlines ADA compliance efforts in the public right-of-way.

From digital data capture to consistent reporting and actionable insights, ADAM offers a feature-rich, competitively priced solution that delivers exceptional value. Whether you’re performing a high-level survey or planning detailed remediation, this scalable tool supports accurate and efficient accessibility assessments. Easy to use and packed with capability, ADAM keeps you moving toward full ADA curb ramp compliance—ask us for a quote today.

ADA Curb Ramp Compliance Reporting

ADAM is a powerful, easy-to-use ADA sidewalk safety assessment and curb ramp assessment and compliance solution.
Combining precision hardware with intuitive, web-based software, the ADAM sidewalk assessment tool streamlines digital inspections, measurements, reporting, and job management. Guided workflows align with standard ADA requirements, state-specific measurements, and evolving regulations such as MUTCD and PROWAG. Populate state-compliant curb ramp reports with consistent, highly accurate data. Designed for efficiency and defensibility, ADAM ensures smooth, compliant curb ramp transitions in the public right-of-way.

Custom State ADA Curb Ramp Inspection form showing elevation at gutter seam too high

ADA Compliant Sidewalk Slope and Safety Evaluation

Analyze ADA Compliance with Precision Using the ADAM Sidewalk Assessment Tool

ADAM’s Sidewalk Assessment Tool — part of the Portal software suite — enables a detailed review of 3D digital infrastructure models for sidewalks, ADA curb ramps, surface conditions, obstacles, and ADA technical infeasibilities. Used in Compliance assessments, these data-rich 3D models deliver comprehensive ADA compliance analysis and reporting.

For quick evaluations, ADAM’s Sidewalk Assessment tools support in-field measurement and data processing directly from the jobsite — no complex post-processing required. When deeper analysis is needed, Compliance workflows bring the site to your desktop with highly accurate models (up to 0.1″ resolution) that eliminate costly return visits.

Easily save and share model views with embedded measurement points for collaboration with third-party stakeholders, archiving, and defensible ADA documentation. Whether you’re screening for risk or preparing for litigation, ADAM sidewalk inspection software helps you capture, analyze, and communicate sidewalk and curb ramp data with confidence.

ADAM Assessment App

Rapid, GPS-tagged slope and curb-ramp assessments – all from your mobile device.

Curb ramp compliance measurement guide

Sample Measurement Guide

Get all these needed measurements on the 3D digital model

Reliable and accurate measurements

Varying elevations shown along the transition

3D Measured. ADA Compliance Verified.

Complete 3D modeling and compliance measurement ensure you have trusted, accurate data to confirm compliance – or identify the exact extent of remediation needed.

Job Management Tool

Online Job Management sidewalk assessment tools to effectively organize, schedule, view, monitor, and download files for use in 3rd party software.

Gain insight, oversight, and easily retrieve, export, and archive inspection records.

Monitor your progress toward ADA sidewalk inspection checklist and ADA curb ramp compliance

Job inspection site map

Inspection Locations

Filter and view by Job or Groupings

Job progress chart

Job Progress

At a glance status views

Accurate 3D Infrastructure Model

Design and Engineering Package Brings the Site to You.

At your fingertips, unlike other inspection processes and technologies, you are provided a 3D infrastructure model, the physical site’s digital twin, that is exceptionally detailed and accurate. View, asses and measure obstacles, technical infeasibilities, slopes, distances, and elevations. Downloadable and shareable in a various file formats and units of measurement, these digital assets will save time, effort and money when (re)design or engineering is needed. LAS file export supports inches, feet, or meters in full or reduced resolution as preferred. Convert LAS file to digital elevation maps in minutes.

Curb ramp 3D infrastructure model - Point Cloud

Point Cloud

Acquired at time of inspection.
Downloadable in multiple file types and units of measurement.

Orthophotos are available if needed.

Rieker’s Advanced Data Acquisition and Measurement (ADAM) Solution

Reputation and Know How

With 100+ years of experience, leadership, and innovation, Rieker’s Advanced Data Acquisition and Measurement (ADAM) solution combines hardware and specialized software resulting in an innovative world-class solution that captures 3D digital infrastructure models (a digital site twin) and enables highly detailed and accurate measurement and analysis on these models.

TRUST and CONFIDENCE

ADAM leverages Rieker’s proven inclinometer (H6 Flex Series) technology to automatically determine and set a zero reference plane. The automated reference plane (ARP) equipment includes parts manufactured and calibrated to meet National Institute of Standards and Technology (NIST) certification standards.

Created with Rieker’s expertise in computer vision tools and techniques and integrated with global positioning system (GPS) technology, the result is a location-specific, highly detailed, and accurate 3D digital infrastructure model enabling NIST traceable measurement, analysis, and reporting.

Effective and Efficient Capability

Using the Model Analysis Tool (sidewalk inspection software) included with ADAM, measurements made on the model (the 3D digital site twin) are consistent, repeatable, and NIST traceable. As needed, model views including all measurements can be saved and shared with 3rd party stakeholders and exported in various file formats for use (import) in 3rd party software.

ADAM also includes a Job Management Tool (sidewalk inspection software) that enables scheduling with due dates, categorization (grouping), mapping, assignment, and monitoring of job status.

How ADAM Sidewalk Assessment Tool Works for Accessibility & Compliance

Assessment, Compliance and Engineering (ACE)
+
Job Management

Watch a quick (< 2min) demo of the ADAM Assessment, Compliance and Engineering Modules + see how the Job Management tools improve workflow and success.

ADAM Job Management Features

Job Management is an important activity toward ADA Sidewalk inspection program and Curb Ramp Compliance. This video introduces you to the many features included in Rieker’s Advanced Data Acquisition and Measurement (ADAM) tool.

ADAM Curb Ramp Compliance Reporting

ADAM combines advanced data capture—including 3D digital modeling—with powerful online reporting tools to support guided and customized ADA curb ramp compliance documentation. Generate accurate, repeatable, NIST-traceable measurements and populate state-compliant reports aligned with local guidelines. ADAM delivers trustworthy data for informed planning, confident decision-making, and legal defensibility of ADA curb ramp compliance in the public right-of-way.

ADAM Sidewalk and Curb Ramp Assessment

Learn how Advanced Data Acquisition and Measurement (ADAM) from Rieker Inc. is your comprehensive ADA sidewalk safety assessment and curb ramp risk assessment, compliance, and engineering solution.

With integrated ADA curb ramp inspection and sidewalk safety measurement tools, customizable reporting, and a 5-minute, data-rich, 3D model capture, ADAM guarantees definitive proof of compliance using consistent, verifiable data and the latest technology.

ADAM Assessment

Assess sidewalks and curb ramps with ease.
Capture GPS-tagged objects, distances, and dual-axis slope data – all from your mobile device.
This brief, sound-free video demonstrates how quickly and accurately sidewalk and curb-ramp data is captured with the ADAM App – right in the palm of your hand.

ADAM Compliance

Experience next-level ADA curb-ramp compliance.
With 3D photogrammetric modeling, advanced analysis tools, and integrated report generation, ADAM Compliance makes data capture and reporting faster and more reliable than ever.

This short, sound-free video demonstrates its speed, precision, and value in action.

ADAM Engineering

Generate high-precision 3D models and LAS files in your preferred measurement unit and density – with optional textured mesh and orthographic outputs.
ADAM Engineering brings real-world accuracy to the desktop, empowering municipal departments and engineering firms with seamless integration into existing geospatial data environments.
Measurement Validation Plates enable precise tie-ins when placed beside known reference points or monuments within the capture area.

This brief, sound-free video demonstrates two models and the rich detail that makes ADAM Engineering a must-have tool.

ADA Curb Ramp Safety Insights

Toward curb ramp safety and accessibility

Get notified of our upcoming Webinars.

Please provide your email address to be added to our invitation list for upcoming webinars. Your email address will not be used for any other purpose than to fulfill your request.

View the ADAM Overview Video to get the complete picture.

View the Video

Download our latest brochure and start a conversation.

Get the Brochure

Download our latest power point presentation.

Get the presentation

Request a webinar to see and experience ADAM first hand

Request a Webinar

Read a recent article from Kittelson & Associates discussing ADAM

Read the Article

FAQ: Still have questions? Get the answers here.

ADAM (Advanced Data Acquisition & Measurement) is a comprehensive inspection and compliance system for curb ramps, sidewalks, and public rights-of-way. It ensures ADA and PROWAG compliance using a powerful combination of high-precision inclinometers, computer vision, and photogrammetry to deliver consistent, traceable, and legally defensible measurements.

ADAM is delivered as a modular offering that we refer to as ACE, and stands for:

Assessment – A rapid, app-based evaluation tool for quick on-site data capture and preliminary analysis.

Compliance – A protocol-driven process using Rieker equipment and measurement standards to create official ADA/PROWAG compliance reports.

Engineering – A detailed, data-rich 3D model and point cloud used for advanced design, remediation, or legal documentation.

Each module can be selected independently or combined to meet the needs of municipalities, contractors, or accessibility engineers.

The ADAM solution is built around three modules that offer increasing levels of accuracy, detail, and deliverables. These can be used separately or as a full workflow:

  1. Assessment Module

Designed for quick on-site evaluations using a mobile app. Enables basic measurements and initial sidewalk/curb ramp documentation—ideal for planning, public works assessments, and preliminary ADA evaluations.

  1. Compliance Module

Implements Rieker’s full ADA/PROWAG protocol with inclinometer readings, photogrammetry, and validated reference measurements. Generates official NIST-traceable Rieker Reports used by municipalities, DOTs, and contractors for certified compliance documentation.

  1. Engineering Module

Provides detailed site geometry including 3D point clouds (LAS), textured mesh models, and LandXML files. Enables civil engineers and designers to plan, regrade, or redesign curb ramps and pedestrian environments with precision—without revisiting the site.

Together, these modules form a scalable inspection and remediation platform for all stages of pedestrian infrastructure management.

Traditional curb ramp and sidewalk assessments often suffer from human error, inconsistent data collection, and a lack of traceable measurements. ADAM solves these challenges through a modular approach—enabling users to select the appropriate level of investigation, accuracy, and reporting for their specific needs.

The Assessment Module offers a fast, user-friendly way to evaluate curb ramps, sidewalks, and pedestrian environments using a mobile device. It leverages:

  • Built-in camera, GPS, and Rieker’s sensor inputs
  • Visual interaction with site features
  • Selection of measurement start and end points
  • Categorized, annotated “events” tied to GPS coordinates

Using guided (form-based) or self-directed workflows, the app prompts users to observe specific features and perform tasks—enhancing consistency and completeness of field data. While highly effective for early-stage analysis, Assessment results are not NIST-traceable and offer lower measurement accuracy than the Compliance and Engineering modules.

For formal verification and defensibility, the Compliance and Engineering Modules incorporate:

  • Rieker’s precision inclinometer and GPS hardware via the Automated Reference Plane (ARP)
  • Measurement Validation Plates
  • NIST-traceable accuracy to within ±0.1″
  • Virtual 3D infrastructure models for analysis and design

These modules generate fully defensible, objective data—ideal for ADA/PROWAG compliance reporting, remediation planning, and legal documentation.

In summary:

  • Assessment is fast, flexible, and ideal for early-stage screening
  • Compliance is protocol-driven and traceable for formal inspections
  • Engineering delivers high-fidelity site geometry for design/redesign

Together, ADAM provides the only scalable, defensible, end-to-end inspection system for pedestrian infrastructure.

ADAM is powered by a modular system of patented hardware, Rieker sensor technologies, and advanced image processing. Each module is tailored to its purpose, but all share the same secure portal for data access, job tracking, and analysis.

Assessment Module

The mobile Assessment App uses onboard iOS sensors (camera, accelerometer, GPS) and Rieker’s own digital sensor inputs to enable fast, lightweight inspections. Users can:

  • Capture slope and distance measurements
  • Tag obstacles and features
  • Record categorized “events” linked to GPS locations

This mode prioritizes speed and usability over precision, making it ideal for large-scale screening or early-stage evaluation.

Compliance & Engineering Modules

For high-accuracy inspections and engineering analysis, ADAM deploys a proprietary and patented system that includes:

  • Rieker’s high-precision inclinometer and GPS sensors
  • ARP (Automated Reference Plane) for consistent measurement orientation
  • MVP (Measurement Validation Plates) with NIST-certified dimensions and reference geometry
  • Structure from Motion (SfM) and photogrammetry, which convert 2D images into accurate 3D models

This combination produces traceable, legally defensible measurements of slope, height, and distance—accurate to within ±0.1”.

Unified Portal

Regardless of the tools used in the field, all ADAM data is uploaded to a single secure portal that enables:

  • Full job and team management
  • Interactive map-based visualization
  • Access to captured data and 3D models
  • Model Analysis Tools (MAT) for QA, verification, and engineering workflows
  • Export of reports and design-grade files for compliance or remediation

In summary:
Assessment prioritizes speed and usability.
Compliance and Engineering prioritize accuracy and traceability.
The portal unifies it all—providing end-to-end visibility, analysis, and output generation.

ADAM supports multiple report types, each tailored to the user’s purpose—whether for early-stage assessments, formal compliance verification, or jurisdiction-specific documentation. All reports are managed through the ADAM portal and backed by data captured in the field.

Rieker Report

A standardized ADA compliance report designed by Rieker Inc.

  • Built from high-accuracy 3D model data captured using the Compliance or Engineering modules
  • Includes NIST-traceable measurements of slope, elevation, and geometry
  • Structured for clear review and defensibility in audits or litigation
  • Ideal for agencies without a predefined report format or looking to supplement internal processes

Custom State Report

A jurisdiction-specific ADA compliance report that aligns with official state requirements.

  • Based on state-defined templates and form fields
  • Automatically populated using ADAM’s Guided Workflow Mode
  • Ensures full alignment with local regulations and field terminology
  • Maintained in partnership with state-level guidelines and updated as standards evolve

Assessment Report

A fast, efficient screening tool for sidewalk and curb ramp ADA compliance evaluation.

  • Generated from mobile inspections using the ADAM Assessment App
  • Captures key observations, slope and distance measurements, and location-tagged events
  • Establishes a clearly defined, repeatable protocol with set thresholds to ensure consistent results across sites and users. Empowers early-phase decisions by accurately outlining scope, scale, and priorities, while keeping the process efficient and reliable.

In summary:

  • Use the Assessment Report for rapid field evaluations
  • Use the Custom State Report or Rieker Report for formal ADA compliance documentation
  • All reports are accessible via the ADAM portal and tied to each job’s captured data

The Engineering Package provides precise, high-fidelity 3D infrastructure models used for remediation planning, design, and reconstruction – without the need to revisit the site.

Each Infrastructure Model includes:

  • Full-resolution LAS point cloud (selectable in inches, feet, or meters)
  • Textured mesh for immersive virtual walkthroughs
  • Orthophotos available upon request
  • 2D image captures and photographic references
  • Reference points (PK nails) available in PDF or CSV format
  • Convert to CAD-compatible site files for import and further design work

Models support custom measurement extraction, evaluation of slopes, grade, and technical infeasibilities, and conversion to elevation maps.

“Bring the site to you – eliminate the need for costly re-visits.”

Yes. The Infrastructure Model lets inspectors or engineers pull new measurements from the original data set. There’s no need to revisit the site if you need to adjust or clarify measurements.

Through an active internet connection, ADAM automatically uploads all data to the Rieker ADAM Portal. The data belongs to the procuring entity and can be downloaded at any time before job closure. Data is securely stored until the job is marked complete.
Otherwise, do let us know if you need ongoing, secure storage.

The ADAM Portal is a secure online hub for accessing inspection results. Users can:

– Geolocate inspection sites

– View automated ADA/PROWAG compliance reports

– Download Infrastructure Models and data

– Manage job files from start to finish

All inspection data collected using ADAM is the sole property of the procuring entity.

Yes. The Rieker Report is tailored to meet both federal ADA standards and state-specific guidelines. For additional requirements, the Infrastructure Model allows engineers to extract any custom measurements from the model. Learn more in our ADA Sidewalk and Curb Ramp Compliance Requirements Guide.

ADAM outputs are used to:

– Document and prove ADA/PROWAG compliance

– Guide remediation and curb ramp redesign

– Defend inspection results in legal settings

– Demonstrate due diligence and measurement traceability (via NIST standards)

Everyone. Accurate and accessible curb ramps:

– Enhance pedestrian safety

– Ensure access for people with disabilities

– Reduce legal and financial risk for municipalities and contractors

ADAM makes ADA compliance faster, easier, and more defensible.

Yes. Major legal cases in Oregon and Los Angeles highlight the steep cost of non-compliance:

Oregon (2016): 97% of 26,000 ramps failed inspection; $23M allocated for upgrades.

Los Angeles (2015): $1.4B ADA settlement over 30 years.

ADAM helps mitigate such liability by offering accurate, defendable compliance assessments.

The Americans with Disabilities Act (ADA) is modeled after the Civil Rights Act of 1964. It ensures equal opportunity for people with disabilities and mandates access to public infrastructure, including sidewalks and curb ramps.

Yes. ADAM was built with legal defensibility in mind. With NIST-traceable measurements and objective reporting, it eliminates subjective judgment and supports ADA litigation defense.

The National Institute of Standards and Technology (NIST) defines precision standards used across industries. ADAM’s data is traceable to NIST, ensuring measurement consistency and credibility – especially valuable in audits or legal cases.

ADAM supports:

– Engineering firms

– Contractors

– Departments of Transportation (DOTs)

– City and municipal governments

– University and college campuses

– Hospitals

– Developers

Anyone responsible for accessible infrastructure planning and inspection can benefit from ADAM.

Yes. Rieker works with certified engineering consultants nationwide. We can recommend a qualified team or assist with your inspection needs. Contact us at inquiry@riekerinc.com or use our contact form.

Rieker’s marketing toolkit includes:

– Webinars & demo videos

– Brochures

– Technical documentation

– Case studies & white papers

These materials help partners, reps, and customers promote and understand ADAM’s full value.

An ADAM sidewalk and/or curb ramp assessment takes under 2 minutes

An ADAM curb ramp compliance inspection takes fewer than 5 minutes

It’s the fastest way to obtain a complete ADA/PROWAG compliance snapshot.

Yes. ADAM’s core technology can be applied to other public infrastructure needs. If you have a potential use case, reach out to inquiry@riekerinc.com or submit your idea via our contact form.

Request a Webinar Today

ADAM Webinar Wednesday, October 30 @ 12PM ET – 30 Minutes

Upcoming Webinar: ADA Compliance Made Easy with ADAM
Dates coming soon — request a personalized session today!

Are you responsible for ADA sidewalk and curb ramp assessment, compliance, or design?

Join us for a quick, informative webinar on how ADAM—Rieker’s patented Advanced Data Acquisition & Measurement solution—helps Civil Engineers and ADA Coordinators confidently meet accessibility standards.

Simplify ADA assessments and documentation
Support compliance with evolving MUTCD & PROWAG guidelines
Reduce liability and streamline prioritization
Enable precise planning, inspection, and remediation

Don’t miss this opportunity to see how ADAM fits into your workflow—fast, accurate, and built for the public right-of-way.

will want to request a webinar today.

Request a Webinar Today